From: route@monster.com
Sent: Sunday, May 01, 2016 7:47 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: Dispatch Clerk
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
TOMAS CORONADO 112 Red
Oak Creek Drive • Oak Leaf, Texas 75154 (469)
688-1719 • tocorona@gmail.com SUMMARY
BS
in Civil Engineering with 1 year 2 months of construction management
experience serving as a project engineer on TXDOT and County small to
mid-size roadway/highway projects, and 3+ years of design and construction
administration experience on mid-size-to-large building projects. Very
detailed and strong problem solver with ability to interface with various
disciplines including engineers, architects, project managers, estimators,
crews, and government agencies. Expertise meeting TxDOT criteria/schedules
for highway/infrastructure projects. Looking to complete my Engineer In
Training experience working along/with a Professional Engineer in material
testing/QC. EDUCATION
TEXAS TECH UNIVERSITY, Lubbock, Texas Bachelor of Science, Civil Engineering, 12/07 PROFESSIONAL EXPERIENCE
Lone Star Civil
Construction Flower Mound,
Texas
September 2011 - Present Highway/Roadway Construction
Company
Project Engineer EIT
Perform construction administration/ managing for
multiple assigned projects ranging in construction costs from $1 to $10
million for design/bid/build projects. · Communicating with various subcontractors and owner representatives through
e-mails, teleconferences, and meetings. · Monitoring field crew production rates and compared it with direct
cost reports. · Negotiated pricing with subcontractors and vendors · Assisted the estimating department with takeoffs, obtaining bid
quotes, and one occasion assisted HCSS set-up for small city project · Attending weekly progress meetings on TXDOT projects · Providing formal project correspondences to the project owner
representatives · Ordering permanent & construction materials and rental equipment
as needed; such as Prestressed Concrete Beams, Precast Concrete Panels,
Bridge Forms, and etc. · Reviewing and submitting shop drawings · Working on a project schedule recovery plan, due to time and
constructability constraints; this required close coordination with a
professional scheduler consultant. · Reviewed invoices Construction Projects Include
· Joe Allen Road in Pilot Point, Texas with $800,000 construction cost
for Denton County Public Works involved constructing a proposed bridge with
approach slabs and pavement transitions. · Fish Hatchery Road in Lewisville, Texas with $750,000 construction
cost for TXDOT Denton County Public Works involved reconstructing a bridge
with a retaining wall, approach slabs, and pavement. · State Highway 31 in Corsicana, Texas with $9.4 million construction
cost for TXDOT Navarro County District Office involved installing a
proposed drainage system and reconstruction of pavement · Interstate Highway 45 in Corsicana, Texas with $850,000 construction
cost for TXDOT Navarro County District Office involved constructing of
entrance ramp to IH-45. Tomas Coronado, Page 1 HUITT ZOLLARS, INC., Ft.
Worth,
Texas
2007 - 2011 Full -service engineering,
architecture, and construction management firm with 1 5 offices across U.S.
Structural EIT
Perform design work and construction
administration for multiple assigned projects ranging in construction costs
from $3 to $20 million including design/build, design/bid/build, and
fast-track projects. · Design structural elements including slab on grade, footings, beams
and columns, lateral resisting systems, and retaining walls to meet design
codes, standards, and owner ‘s requirements. · Coordinate with other engineers and architects to develop drawings for
projects. · Communicate with various disciplines through e-mails, teleconferences,
and meetings. Design Projects include: · Victor Valley Transit Authority in Hesperia, California with $19.5
million construction cost including 16,650 SF administration and operating
facility, 22,850 SF maintenance building, and 17,905 SF fuel and wash
building with total design cost of $4.82 million. · Small arms facility renovation and new construction project with $22
million construction cost including 83,385 SF for U.S. Army Corp of Engineers
in Annistan, Alabama. · New Fort Bliss Commissary facility with $20.3 construction cost
including 111,787 SF in El Paso, Texas for Defense Commissary Agency and U.S
Army Corp of Engineers. Construction
Administration Review
contractor submittals, Request for Information (RFI), shop drawings, and
field reports to ensure material specifications and plans are accurate, and
contract obligations are satisfied. Review and verify change
order requests from contractors and sub-contractors. Projects
Include: · Northwest Rail operating service and inspection facility with $66.5
million construction costs for DART’s light rail transit system in Dallas,
Texas including two-story building designed to support super light vehicles
maintenance and rail operation dispatch functions. · Administration, operations, administration, and fuel and wash
buildings with $19.5 million construction costs with total of 48,000 SF for
Victor Valley Transit Authority in Hesperia, California. · Created structural assessment field reports, asbuilt drawings, and
photographs and coordinated with Corps of Engineers, Department of Public
Works, Real Estate Property owners, and other departments to complete
inspections for 24 Fort Bliss warehouses. Tomas Coronado, Page 2 COLLEGE INTERNSHIP ED BELL CONSTRUCTION COMPANY, Dallas, Texas
Summer of 2003 to 2006 Highway, infrastructure, and
municipal reconstruction company
Intern Assisted on 15+ highway and municipal
construction projects, during summer internship, ranging from $5 to $64
million in contract value. Subtasks included concrete paving,
earthwork, base and sub-grade preparation, concrete flatwork, and structure work
for highway construction. ·
Assisted surveying supervisor and CAD technician
in coordinating plans used by survey crews to ensure limits and layouts for
abatements, bents, columns, beams, and slabs meet TxDOT requirements. ·
Assisted surveyors in setting blue tops, paving
nails, subgrades, checking control points, and laying out right-of-way
stakes. ·
Digitized cross-sections and contour lines to
check embankment and excavation qualities and performed mass haul diagrams. ·
Performed take-offs for cut/fill limits and other
materials such as reinforcing steel and concrete volumes used to establish
bid quantities. ·
Prepared asbuilt project schedule for TxDOT issue
claims using Suretrak software. ·
Learned fundamentals of Terramodel software
including building roadway templates, drawing paving limits and other
structures, plan and profile alignments, and exporting/importing files. ·
As part of team, contacted vendors and
subcontractors to obtain RFQs for various projects. ·
Participated in pre-bid meetings and on-site
field visits with project managers and coordinators. PROFESSIONAL ORGANIZATIONS
ASCE, American Society of Civil Engineers – Active
CI, Construction Institute - Active SOFTWARE SKILLS MS Office
including Word and Excel Terramodel,
Paydirt, Sitework, GTCO Digitizer, Agtek, and AutoCAD SureTak Familiar with
HCSS Tomas Coronado, Page 3 |
|
|
|||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
|
|